Rule fit
Published target: 8% / 5%.
Close call — choose by loss model and payout path.
Compare the exact program rows that shape risk, payout timing, and the chance of surviving the account.
| RuleWhat it means and why it matters | WSFundedWall Street Classic · $2.5K–$100K | Maven TradingBuy Now, Pay Later · Multiple sizes | EdgeWhich firm has the advantage |
|---|---|---|---|
| Profit targetWhat you need to earn | 8% / 5% | 4% | Compare rules |
| Daily lossIntraday loss pressure | 5% | No mapped daily limit | Compare rules |
| DrawdownHow the breach is measured | 8% static | 10% static from initial balance | Compare rules |
| Minimum daysRequired trading pace | 4 days | None | Maven Trading |
| Profit splitHow profits are shared | Up to 80% | Up to 80% | Tie |
| Payout pathWhen you can get paid | First request from day 15 | Programme-specific | Compare terms |
| Max scalePublished ceiling | Scaling available | Plan-based | Compare terms |
These rows are research examples, not your account. Open a firm profile to continue in TSB, then choose the exact challenge and add your trades.
Published target: 8% / 5%.
First-phase target: 4%.
5% daily / 8% static max.
No mapped daily limit daily / 10% static from initial balance max.
Works with MT5.
Works with MT5, MatchTrader, TradeLocker.
Check profit target, drawdown type, and key rule differences.
Match the platform, market, and payout path to your trading.
Verify live price, availability, KYC, and payout terms.
Use this as a structured shortlist, not as final financial advice. Check live checkout price, KYC availability, rules, and payout terms before buying an evaluation.
| Selected firms | WSFundedForex/CFD challenge accounts | Maven TradingForex/CFD challenge programs |
|---|---|---|
| TSB Fit Score | 78/100 Strong comparison candidate | 79/100 Strong comparison candidate |
| Markets | Forex, Indices, Metals, Crypto | Forex, Indices, Metals, Crypto |
| Platforms | MT5 | MT5, MatchTrader, TradeLocker |
| Evaluation model | Forex/CFD challenge accounts | Forex/CFD challenge programs |
| Primary account size | $2.5K–$100K | Multiple sizes |
| Primary fee | Choose an exact reviewed configuration | Choose an exact reviewed configuration |
| Profit target | 8% / 5% | 4% |
| Daily loss | 5% | No mapped daily limit |
| Max loss / drawdown | 8% static | 10% static from initial balance |
| Payout terms | Up to 80% / First request from day 15 | Up to 80% / Programme-specific |
| Max scale | Scaling available | Plan-based |
| Promo status | No TSB partner offer | 10% off |
| External trust signal | 4.3 / 4.6K+ reviews | 4.7 / 4.4K+ reviews |
These are the connected program rows TSB is using for this comparison. A firm can have multiple plans, so treat this as the mapped decision row and verify the official checkout before paying.
| Firm & program | Structure | Loss limits | Price & payout |
|---|---|---|---|
| WSFunded 3 mapped programs | |||
| Program Wall Street Classic Connected research row | Account$2.5K–$100K Steps2 steps Target8% / 5% | Daily loss5% Max loss8% static | PriceChoose an exact reviewed configuration Profit splitUp to 80% Payout pathFirst request from day 15 |
|
Decision note
Primary pressure: 5% daily loss, 8% maximum loss, static drawdown. Verify the exact configuration before checkout. |
|||
| Program Wall Street Elite New Connected research row | Account$2.5K–$100K Steps2 steps Target6% / 6% | Daily lossNo mapped daily limit Max loss6% static | PriceChoose an exact reviewed configuration Profit splitUp to 80% Payout pathFirst request from day 30 |
|
Decision note
Primary pressure: 6% maximum loss, static drawdown. Verify the exact configuration before checkout. |
|||
| Program Instant Pro Connected research row | Account$2.5K–$100K StepsInstant funding TargetSee programme rules | Daily loss3% Max loss5% trailing balance/equity high; locks at starting balance after approved payout | PriceChoose an exact reviewed configuration Profit splitUp to 80% Payout pathFirst request from day 15 |
|
Decision note
Primary pressure: 3% daily loss, 5% maximum loss, trailing balance/equity high; locks at starting balance after approved payout drawdown. Verify the exact configuration before checkout. |
|||
| Maven Trading 3 mapped programs | |||
| Program Buy Now, Pay Later Connected research row | AccountMultiple sizes Steps1 step Target4% | Daily lossNo mapped daily limit Max loss10% static from initial balance | PriceChoose an exact reviewed configuration Profit splitUp to 80% Payout pathProgramme-specific |
|
Decision note
Primary pressure: 10% maximum loss, static from initial balance drawdown. Verify the exact configuration before checkout. |
|||
| Program Instant Connected research row | AccountMultiple sizes StepsInstant funding TargetSee programme rules | Daily loss2% Max loss3% trailing from highest equity | PriceChoose an exact reviewed configuration Profit splitUp to 80% Payout pathProgramme-specific |
|
Decision note
Primary pressure: 2% daily loss, 3% maximum loss, trailing from highest equity drawdown. Verify the exact configuration before checkout. |
|||
| Program Mini Connected research row | AccountMultiple sizes StepsInstant funding TargetSee programme rules | Daily loss2% Max loss3% trailing from highest equity | PriceChoose an exact reviewed configuration Profit splitUp to 70% Payout pathProgramme-specific |
|
Decision note
Primary pressure: 2% daily loss, 3% maximum loss, trailing from highest equity drawdown. Verify the exact configuration before checkout. |
|||
See what is officially mapped, where outside reputation data comes from, and which rule details still need a live check.
| Firm | Program evidence | External trust | Rule checks | Action |
|---|---|---|---|---|
| WSFundedForex/CFD challenge accounts |
Official source mapped
Official source dossier reviewed 2026-09-11
Primary pressure: 5% daily loss, 8% maximum loss, static drawdown. Verify the exact configuration before checkout. |
4.3 / 4.6K+ reviews Trustpilot snapshot |
|
Official source |
| Maven TradingForex/CFD challenge programs |
Official source mapped
Official source dossier reviewed 2026-09-11
Primary pressure: 10% maximum loss, static from initial balance drawdown. Verify the exact configuration before checkout. |
4.7 / 4.4K+ reviews Feefo snapshot |
|
Official source |
Use the side with stronger source coverage and rules that match your market. TSB Fit Score is a shortlist signal, not a guarantee.
It can change checkout price, but it should not override drawdown pressure, payout terms, country availability, or platform fit.
Tie means the shown values match. Compare rules or terms means the details are not safely interchangeable. Verify data appears only when a selected value is missing. A named edge compares the displayed value, not qualifying-day definitions or payout eligibility.